FROM SURFACE
TO SOLUTION.

A clear technical view of our water-well and mineral exploration drilling service lines.

DIVISION 01 / MODERN WATER

WATER IS
A RESOURCE.
ACCESS IS
AN ENGINEERING JOB.

Modern Water supports clients from planning and well drilling to well development, testing and acceptance. The scope is built around delivering a completed well, not just drilled meters.

  • Groundwater and production well drilling
  • Well casing, construction and gravel packing
  • Well cleaning, development and test pumping
  • As-built reporting, testing and client handover
Company drilling crew and Royal Sondaj water rig at a worksiteMODERN WATER / ORIGINAL COMPANY PHOTOGRAPH
Illustrative conceptual image of mineral exploration core drillingILLUSTRATION / REPLACETETRA / PHOTO PENDING
DIVISION 02 / MODERN TETRA

EXPLORE
WHAT LIES
BENEATH.

Modern Tetra is the mineral exploration drilling direction, with two TETRA rigs in the stated fleet. The exact drilling methods, core sizes and depth ratings need confirmation from the machine passports.

  • Mineral exploration drilling programs
  • Core recovery, handling and sample custody support
  • Exploration-site preparation and mobilization
  • Daily operational reporting and project documentation
AN OPERATIONAL METHOD

FROM BRIEF TO
HANDOVER.

The sequence can be customized for each job and each service line. It makes responsibilities and client decision points visible.

01

Define

Receive project objectives, specifications and boundaries.

02

Assess

Review site access, geological context and technical constraints.

03

Mobilize

Prepare machinery, crew, materials and site logistics.

04

Execute

Deliver planned drilling and construction work with daily reporting.

05

Verify

Test, document, reconcile and hand over agreed deliverables.

TECHNICAL DOCUMENTATION

CLEAR RECORDS.
CLEAR DECISIONS.

Our project reporting templates can include the following fields. These are examples of what the system should track, not claims about systems currently operating.

01

Daily progress

Meters drilled, dates, shift details, rig hours and activity status.

02

Technical details

Geology, drill parameters, core or casing records and well construction steps.

03

Readiness & costs

Fuel, material issues, equipment availability and field logistics.

04

Safety & site control

Inspections, risk observations, incident records and corrective actions.

05

Acceptance testing

Water-level measurements, pump tests and signed completion documents.

06

Approvals & handover

Responsible reviewers, client acknowledgment and formal project completion.

QUESTIONS CLIENTS ASK

LET THE
DETAILS
DRIVE.

Before a proposal can be issued, the team typically needs scope, location, required depth, access conditions and timing, along with any available geological or hydrogeological information.

What information should I share for a water well quotation?

Site coordinates, intended water use, expected flow, estimated depth, geological information and access requirements are useful starting points.

Can one company provide both water drilling and mineral exploration services?

Yes. Modern has two divisions: Modern Water and Modern Tetra, with a fleet consisting of one Royal Sondaj rig and two TETRA rigs.

Do you provide testing and completion documentation?

The intended Modern Water service scope includes well development, testing and acceptance documentation. Exact contract deliverables must be agreed for each project.

Where can I find the confirmed machinery capacities?

Once verified, machine-passport details will be published in the Fleet section and reflected in commercial proposals.

LET’S CONNECT

TELL US WHAT
YOU NEED TO REACH.

Share the site, requirements and intended scope. We will prepare a tailored discussion once contact details are connected.

REQUEST A PROPOSAL